Tag Archives: Sizzix

In spite of February being a short month and me being gone a lot to watch my granddaughter’s last season of basketball, I managed to get quite a bit accomplished.  Enjoy!

I was searching in my sewing closet for something, can’t remember what, but discovered that I hadn’t yet quilted the Zigzaggy quilt.  So I pulled it out of the closet, found a piece of fabric in my stash large enough to make a backing, pieced some batting together, and loaded everything on my longarm.  I decided to try one of my pantographs that I had not yet used and chose one called Baby Curls.  And I loved it not only for how it looked on this quilt but for how quickly it went.  I had this large throw size quilt on and off my frame in about 2 1/2 hours.  Fastest quilt job I’ve ever done.  Then I got busy and used the rest of the afternoon to bind it.  My first finish for the month and a bit closer to meeting my goal this year of using up all those 2 1/2″ squares and strips I cut over two years ago.  You will be hearing a lot about my meeting this goal because there were way more of these pieces than I figured on and although I used up a great many of them last year, there are quite a few left to go.

In fact I’ve already started two more scrap quilts out of them.  This one is awaiting borders, quilting, and binding.

IMG_7963

And the other one is taking up the left half of my planning wall.

IMG_7967

In fact it is pushing me to get the remaining blocks sewn together for the Rainbow Garden Log Cabin quilt which is taking up the right half of my planning wall.  You see, Rainbow Garden is tedious to work on, so I procrastinate.  And because I need more space on the planning wall so I can add more blocks to the scrap quilt on the left…..well, you get the picture.  I do have 8 rows of Rainbow Garden sewn together, and I am really liking how it is looking.

IMG_7969

I did check off one of my goals for 2019 as completed – the cover for my Sizzix eclips2 cutting machine.

I used a 7 inch circle to make the arched pieces at each end and then just cut a rectangle the size I needed to go over the top of the machine.  I cut and sewed the lining first testing and adjusting for fit as I went.  Once I was happy with the fit, I cut and sewed the cover, added the lining, and, tada!, a bright and cheery cover for my machine was done.

I hope that your February was productive and fun, and here’s looking forward to seeing what we can get done in March.

Happy Crafting!

Lana

Advertisements

A Look Back at 2018

Wow!  What a fun-packed busy year!  I completed so many projects!!!  Here is a recap:

I completed

  • 11 quilts, all were oversize throws and bed size
  • 14 placemats
  • 161 quad Log Cabin blocks to complete the 192 needed for my quilt
  • 2 pairs of house booties as birthday gifts for 2 of my granddaughters
  • 1 doll clothes pattern which was released early summer and only sold 2 copies
  • at least 11 pieces of doll clothing and accessories
  • 7 miscellaneous projects, and
  • 1 online quilting class with Lisa Calle

And I have no doubt that I’ve forgotten to list something.  To see and read about all these projects, just scroll down through the past eleven months of my life.

Looking Forward to 2019

As I worked on my quad Log Cabin blocks during December, I was thinking about how I was going to plan 2019 in order to complete all that I want to get done.  Here is what I’ve come up with so far:

  • I have 192 quad Log Cabin blocks that need to be sewn into 16 rows of 12 blocks each and those 16 rows need to be sewn together.  I have finished sewing the first row and have started the second.  I think that I will just jump on this and get it done.  It is actually going faster than I anticipated.  When all is together the borders need to be cut to size and the appliqués put on them.  Then there is the quilting and binding and labeling to do.  I really would like to complete this quilt by the end of 2019 but am thinking that I may be setting my goals a tad too high since I like to mix in other projects as I go along.

IMG_1299

  • I have 14 appliquéd placemats to make.  The background squares are cut and ready to sew together.

IMG_7931

  • I have a quilt on my frame to finish quilting and three in the closet to quilt.  And after they are quilted, there will be bindings and labels to do.
  • I want to use up all the 2 1/2” squares and strips I cut from thrift store shirts, skirts, etc.  They will be sewn into quilts that will be donated.  I’ve already chosen a pattern for the next one.  Just need to decide what neutral color to use for the background.  I have a bolt of white in my stash.  That always looks nice.
  • I’ve chosen a piece of home décor fabric from my stash to make a cover for my new Sizzix eclips2 electronic cutting machine.  I need to do that right away to keep the machine lint and dust free.
  • And I want to take more online quilting classes.  I paid for a subscription and would really like to take advantage of it.

What do you think?  Is there enough time in 2019 to do all of this?  One thing that should help is the Sizzix eclips2 I got for Christmas.  This machine will save me time in cutting out all the appliqués I need for the placemats and the Log Cabin quilt border.  Stay tuned to find out how it goes.

Happy Crafting,

Lana



%d bloggers like this: